Showing posts with label sweater. Show all posts
Showing posts with label sweater. Show all posts

Wednesday, March 8, 2017

WIP Wednesday: Hyperion Pullover

At this moment, I don't have much on the needles for Work In Progress (WIP) Wednesday. I have several projects in the hopper that I'm getting ready to cast on, but the only active project is the Hyperion Pullover. However, I haven't progressed beyond the first sleeve. As of last night, I had about 3 inches done, but then decided that it looked too big and ripped it out to start over.

I am excited to make this sweater, I haven't made one in a long time. The construction is different from a lot of knitted sweater, you cast on for the cuff of one sleeve and work the yolk across to the other sleeve. After that is done, you pick up stitches around the bottom to finish the body of the sweater. As much as I hate picking up stitches, it will be an interesting challenge.

I'm knitting it in Comfy Fingering weight yarn from Knit Picks. It is a Pima cotton and acrylic blend, perfect for warm weather. The color is blackberry, a lovely dark purple.

Because this project is barely started, I only have pictures of cast on stitches and some yarn.

The mess of yarn is from frogging the last attempt at this sweater.


Hopefully, my lack of other projects will allow me to focus my energy on this project to get it completed fairly quickly.

Sunday, June 3, 2012

Wouldn't You Know It?

I'm a big fan of wooden knitting needles,they have a much better feel than plastic and are much warmer (and less noisy) than metal. With the exception of socks,* almost all of my projects are knitted on wooden needles.

Poor, sad, broken, needle. :(

But, one problem with wooden needles is that they can break. In my experience, they don't break often, just when you do things like step on them. Thankfully, breakage is usually pretty rare.

However, I'm knitting on a deadline right now. So, breakage was inevitable. Husband forgot that a house rule is to check for stray needles before sitting (though Husband would say that it was my fault for leaving my knitting of the couch). I was left with a broken stump of a needle, and a half finished sweater.

My Citron shawl, off of the needles and blocking

I was forced to order replacement needle tips, and of course, I had to include some yarn (I needed to qualify for free shipping after all). The package took about a week to arrive, so that forced gave me the opportunity to complete my Citron shawl. It worked out well, actually, I bound off the shawl on the same day the box arrived.

Still, that was a week with no progress on the sweater, and now the wedding is only 13 days away. I have divided for the armholes and have about seven inches left on the body, plus the sleeves, and the ruffle trim. As a precaution, today I ordered a cardigan that would also work well with the skirt.

Sweater progress
*As a side note , I would love to knit socks on wooden needles as well, but when they are that tiny, wooden needles just don't withstand the wear and tear I inflect upon them (and yes, I'm reasonably certain that the problem is me, not the needles.

 

Friday, February 3, 2012

Project Talk: Some Assembly Required

As a process knitter, I’m not a huge fan of finishing work. Why waste the time doing silly things like blocking, weaving in ends, and sewing seams when you could be actually knitting. I would think finding the motivation to finish would be easier for project orientated knitters, as it is a vital step in having a completed project (but seeing as I’m not a project orientated knitter, I cannot be sure. Anybody want to verify?).


Spatterdash Mitts, Done!
Thankfully, most of the projects I choose to work on don’t require too much in the way of finishing work. There are exceptions, the Carry-All Tote and Hey Teach! cardigan being the freshest ones in my mind. Thankfully, the Spatterdash fingerless gloves from Knitty.com didn’t require all that much finishing work. Just the usual blocking, weaving a couple of ends, two seams, and some buttons.  Okay, not some buttons, many buttons, a lot of buttons, 14 buttons per glove.

Definently worth the finishing.
But the end result is worth it. They turned out beautifully! The yarn is Imagination Hand-painted Sock yarn from KnitPicks.com in the colorway Wicked Witch, and it is amazing! I’m not a huge fan of it for socks, I have trouble with shrinkage and felting (I line dry, but machine wash, which might be part most of the problem), but the colors are amazing and the yarn comes out so soft after blocking! I think I’ll stick to using it for non-sock accessories. Stroll, also from Knit Picks, is my absolute favorite for socks, just in case anyone was wondering.

Sheepcote sleeves and start of the main body.
In other project news, I’ve completed the second sleeve and cast of for the body of the Sheepcote pullover, from the Twist Collective and am on the leg of the second of my Surfin’ Peacock socks, so I’m making progress, little by little. Once finished with the Peacock socks, I’ll be (hopefully) testing my Packer Sock pattern and after Sheepcote, I am absolutely, no excuses, finally getting to the February Lady sweater.
And a side note about the sleeves of the Sheepcote, the are 3/4 length sleeves on a yolked sweater. So I know that they look short and chunky, but I've tried them on and they are going to work out great for the sweater.

Monday, December 19, 2011

Project Talk: In a Slump

Lately I’ve been feeling rather blah about my knitting. Well, actually to be fair, I’ve been feeling rather blah about a lot of things, which just so happens to include my knitting. Not sure if it’s holiday stress, weather, the fact that I’ve been sick, or something else, but things are just very blah.
Usually for the holiday season, I plan on knitting an impossible combination of gifts and decorations. This year? Zero, zilch, nada. I thought about knitting something for my mom, but never got beyond the idea in my head. (Sorry, mom, maybe for mother’s day, or your birthday, or next year)
There’s nothing wrong with the projects that are on my needles. In fact, I’m pretty happy with the projects. I’m hoping that over the next few days, an increase in family time equals an increase in knitting time, the trip to Lambeau field not only provides several more hours of knitting time, but also serves to inspire me to translate a couple of football related ideas from my head to actual knit goods (or just to paper, before the ideas leave my brain for that matter) and writing about the projects serves to inspire me to pick up the needles and knit more.

So here’s what is on my  needles right now:
  
Socks, of course. Currently, I’m working on Cookie A’s design, Cubist socks. As the name implies, it has a geometric pattern that resembles cubes. I’m knitting them out of Malabrigo sock yarn in the colorway Abril, which is some beautiful shades of purple. The pattern looked a little intimidating at first, but really isn’t too bad. I’ve gotten past the gusset decreases for the first sock.

Spatterdash Fingerless Gloves. I’ll admit it, I’ve become a convert to fingerless gloves. At first, I thought they were useless, but after making a pair, I’m hooked. I had a beautiful pair of End Paper Mitts, but they are now happily on the hands of a friend, so I needed another pair. This pattern, Spatterdash found on knitty.com, combines buttons and ruffles, so I can’t go wrong. I’m using Knit Picks Imagination sock yarn in the colorway Wicked Witch for those. The green in the yarn looks like it will match my winter coat beautifully, so I’m happy so far. I am a little concerned that the gloves might be too small, and I might need to start over with a bigger needle, but I really need to get more done before making that decision (Yes, I know, this is usually a recipe for me griping in a couple of weeks wondering why I didn’t just rip out and start over when I first suspected they might be too small, but this pattern for gloves is different than any I’ve done before, so I’m honestly not sure).

Sheepcote Pullover. This one started out as a love story. I saw it in the Twist Collective and had to buy the pattern, immediately went out to find suitable yarn and couldn’t wait to get started. It immediately jumped ahead of the February Lady Sweater, which has been next up forever (but things seem to keep budging ahead in line…I really need to do something about that). So I casted on, over a month ago, and have completed one sleeve. I still like it, and I’m not sure what the actual problem is. Maybe it is that sleeves just aren’t that fun and things will get better once I get to the actual body of the sweater, either way, progress has been slow.

Of course, there are some perpetual works in progress out there on the needles. The Scrap Sock Yarn blanket, which may very well never be finished, and the Yggdrasil Afghan; which, without a deadline, just gets neglected. I might buckle down and make it my Wednesday night project to work on while husband is away at Lions and basketball.

So that’s what is on my needles, hopefully I will be able to report some actual progress sometime soon!

Tuesday, October 25, 2011

Project Talk: Finishing Work

The Mythos Cardigan is finally knitted, off of the needles, blocked, grafted together, i-cord applied, and blocked again! In other words: It is finally finished!
Finally done!

The sweater was intended to be a quick little knit, and a perfect little cardigan for chilly summer nights. It never intended to be a warm cardigan for late fall wear. But the cardigan somehow took five months to complete and I now have a charming little summer sweater all ready to wear in late October in Wisconsin. Sigh, the best laid plans.

However, it is still a cute little summer sweater, and I'm pretty happy with how it turned out. Mostly, I was impressed that it could go  two shapeless pieces of fabric, neither one remotely resembling an article of clothing (ok, husband said it kind of looked like a giant thong), into a perfectly wearable sweater.

In other words, it transformed from two of these:

The first side, knitted, but unblocked.

To this:

The pictures of me wearing the sweater aren't the greatest, but keep in mind that they are pictures of me taken by me (and I had no make up on and hadn't done anything with my hair, thus the cutting off at the neck).

Most non-knitters, and some knitters don't realize the amount of work that can go into a finished piece of clothing even after the main part of the knitting is done.

The first step in the process of finishing most freshly knit goods is a nice soak in warm water and wool wash. I usually use Soak Wash, which requires no rinsing and smells absolutely wonderful. I'm also a fan of Kookaburra Wool Wash as well. This particular sweater got a bath in Kookaburra.
Then I drain the sink, letting gravity do the first part of the water removal. Wool can soak up a lot of water, and can take a long time to dry, so it is best to try to get as much water out of it as possible to speed up drying time.

Then you wrap each piece in a bath towel, carefully rolling up the towel. I usually walk across the towel a couple of times to squeeze some more water out of it. After that both towels go into the washing machine and ran through the spin cycle.
Yes, I know you don't usually throw hand knit goods into the washing machine (at least I don't). But that is why they are wrapped up in a towel and run through for only the spin cycle.

After the bath, it is time to block the sweater. Usually this is only done with natural fibers, as blocking acrylic doesn't really work all that well. The method used for this sweater is called wet blocking, because you pin it out when the knitted pieces are still wet and let them dry that way (creative name, right?). There are other methods of blocking, but wet blocking is usually what I use whenever the knit fabric will allow.
Blocking involves pinning the pieces out to the correct measurements. So I headed upstairs with a bowl full of rust proof pins, some towels, a tape measure, and the sweater schematics from the pattern.

I decided to pin the pieces out on towels laying onto of a mattress. This method works pretty well for larger pieces. It is nice because you can just stick the pins straight into the mattress. I also have blocking mats, but those work better for smaller piece. This sweater was pretty lightweight, and the pieces were symmetrical, so I just pinned them right on top of each other (this would never work for a heavier sweater, it would take forever to dry).
All pinned out.
Once all pinned out, it was time to let the sweater dry. Minerva, being ever helpful, decided to supervise the drying process. Perhaps she felt that being named after the Roman goddess of weaving also gave her responsibility when it came to knitting. Also, cats, mine at least, love to help with the entire knitting process.
After the pieces were dry, it was time to start the assembly of the sweater. First I sewed the sleeve and side seams. Seaming always seems to require stretching and squishing the pieces to get them to match up. I don't like poking sharp pins into the pieces to hold them, but I've discovered that bobby pins actually work beautifully. They clip the pieces together without damaging the fabric and are easy to put on and take off. So I pinned and sewed the side seams and sleeve seams. I wouldn't usually post a picture of sweater pieces pinned together, but I am pretty proud of my new use for bobby pins (yup, just like MacGyver).
My brilliant idea.
Then came the back seam. This pattern called for leaving the back stitches live, and grafting them together using a method called the Kitchener stitch. I've used the Kitchener stitch for the toes of socks before, but never on this scale. The first part of the back looks a little wonky, but by the end I was pretty good at it. Then, I used applied I-cord to add trim around the neck. Applied I-cord is tedious, but gives a very nice edge. I whip stitched the bottom hem, and the piece was ready to block again.

So, the piece went back into the sink, was wrapped in a towel, and took another spin in the washing machine. Then it went back upstairs to the mattress. Thankfully, it looked a lot more like a cardigan when I pinned it out this time.


Again, I left it to dry overnight. In the morning, I came back for it, shooed the cat off of it (Bode this time, not Minerva), unpinned it. There was nothing left to do but try it on, and attempt to take some pictures.

The sweater was knit out of Stroll Tonal from Knit Picks. The colorway is called Pearlescent. It combines shades of ivory, light grey, and medium grey as well as some light shades of platinum and silver. It is actually a pretty combination of neutral grey tones with some warm undertones. In some light, it appears to have some hints of a pinkish undertones, but in other light seems to be purely grey tones. It is a hard color to accurately capture on camera. In my opinion, the color is closest in the picture where Minerva is sitting on the sweater pieces or in this last picture.

All in all it turned out pretty cute. I'm excited for next Spring to roll around so I can actually wear it outside of the house. 


What's next?

I'm taking a brief break from large projects and making myself some new fingerless gloves, using Eunny Jang's Endpaper Mitts pattern. I'm also determined to finish husband's hunting socks before the opening of deer gun season (practically a holiday in Wisconsin). Then maybe I'll start thinking about Christmas knitting...maybe.

Tuesday, August 16, 2011

Process vs. Product

I've said it before, and I'm sure I'll say it again (and again), I'm a process knitter, not a project knitter. From what I've observed about knitting, most knitters fall into one of these two camps, though I think most are unaware that you can categorize knitters into these two types.


For me, it all comes down to a basic difference in knitting philosophy, a different reason for why we knit. I do not knit to make stuff, I knit for the enjoyment of knitting. I enjoy the click of the needles, the feel of the yarn, and the action of manipulating the yarn into little loops. The stuff that is created is an added perk, but not a reason to knit. It is all about the journey, not the final destination.


On the other hand, creating stuff is what it is all about for product knitters. After all knitting is a way to make stuff. I'm not saying that they don't enjoy knitting, it wouldn't make sense to knit if you didn't, but they enjoy the creation of a hand-knit item. The goal is to arrive at the destination. And in my experience, project knitters tend to complete more projects faster than process knitters.


Being a process knitter also explains some of my knitting habits to me. I don't mind having projects that sit on the needles for long periods of time, because it's not about getting the projects done. This is also why I have pieces that are almost finished sitting in a basket because they simply need to be assemble, or have ends woven in. I enjoy the process, but I don't necessarily enjoy the finishing work, and since I'm in no hurry to have a completed item, I don't mind letting the pieces sit. I'm pretty sure this is also why I'm not so good at knitting on a deadline.


However, despite of my love of the process, every once in awhile, a project gets in my head. I'll come across a pattern or design or idea, and it will become an obsession. I will toss everything else aside and focus solely on one project until it is done. It happened with my Llama hat, my Owls Pullover, and my Carry-All Tote.


But this is rare for me, up to today, it had only happened three times in years of knitting. But now, it has happened again. I was browsing patterns in the latest issue of the Twist Collective (an online knitting magazine) and came across a pattern that I knew that I had to knit, the Sheepcote Pullover. I can't explain it, it was love at first sight.


I saw the sweater, followed the link to the pattern, and printed it out. Then I spent time digging through my stash to see if I had yarn that would work (I didn't). Then I spent a good portion of the afternoon going back and forth. Logically, I knew that I should first knit with the yarn I have stored upstairs and not by new yarn. But that would mean putting this sweater on hold. I wrestled with myself for a long time, but finally gave in to my impulse. I ordered the yarn for this sweater. I also know that as soon as the yarn arrives, I will cast on and knit on it obsessively until it is complete. That's what happens.


In the end, it's not so bad. I'll have a new sweater to wear by the time sweater weather hits Wisconsin (probably before). And I fully intend to not buy more yarn before the end of the year. I know I have a good sized stash, and I should be able to knit from it for some time after this project. And I don't feel too bad about giving in to this urge, knowing that it most likely will be a long time before the next one hits (I hope, it hasn't been that long since I finished the Carry-All).


Because I know there is some obsessive knitting looming on the horizon, I am going to be working overtime on the Bridges of Roses socks, I've started on the leg of the first sock, so hopefully I can get it finished (especially as they are a birthday present for my mother-in-law, whose birthday was five days ago). I'd also like to get in some progress on the Mythos Cardigan, so here's hoping that shipping is slow!

Wednesday, July 20, 2011

Project Talk: Looming Deadlines

In knitting, I don't find myself facing a lot of deadlines (note the addition of "in knitting" to that statement, in other areas of my life, deadlines are more of an issue). This could be because I allow myself lots of time to finish a project, such as the baby blanket I had completed by May for a baby due in July, or because I mainly knit for myself. Once in a while, I do find myself up against the ticking clock. And that clock is ticking away right now.
These might actually fit!

Deadline # 1: Mom's Birthday, July 27

In a post from yesterday, I mentioned that I was in the process of designing/knitting some Green Bay Packer inspired socks for my mom's birthday. What I think I failed to mention in that post was that my mom's birthday is coming up quick. I had to start over from cast on today, which gives me one week to crank out a pair of sock (not only crank out, but develop and correct the pattern as I go). Despite making pretty decent progress today, I'm thinking mom's birthday gift may be a little bit late this year.

Deadline #2: Karen's Wedding, July 30
Harry Potter & knitting, a perfect combo


Progress so far
Karen is a dear, dear friend from elementary school. She's getting married at an outdoor wedding in Wisconsin Dells the last weekend in July. Since it's outdoors, and will most likely be hot, attire will be pretty casual. I have a navy sundress that I'm planning on wearing, but I felt that it was a little blah. And what better to add some zing to an outfit that a hand knit lace wrap? I cast on for the Invisibility Wrap from Charmed Knits, a collection of Harry Potter inspired patterns. I'm knitting it out of Knit Picks Shimmer Hand Dyed yarn in Cumulus, which is different shades of gray. I'm also adding beads to the design. The wrap is turning out beautiful, in my opinion, but I just don't know that I will be able to get it done in time for the wedding. But, as I have no backup plan for accessorizing my outfit, I am remaining optimistic. It was slow going at first, but the speed is picking up as I memorize the lace repeats in the pattern.  Fingers crossed!

Deadline #3: Bridges of Roses KAL, August 26

This is only my second Knit-A-Long (KAL). I participated in one before when I made my After Hours Shawl . This one is sponsored by the same company, Knitters Brewing Co. This time the KAL project is a pair of socks with embroidered roses. I'd love to show pictures of my progress on these socks, but truthfully, I haven't even cast on for them. I have the yarn sitting on my end table, reminding me, but the other two deadlines are just so much closer.

Thankfully, right now I only have those three knitting deadlines. But those are not the only projects on my needles. I also have another pair of socks, the Devil's Snare socks (Harry Potter inspired), but those are on hold while I work on the two other pairs.

See? It looks nothing like a sweater!
I'm also working on the Mythos Cardigan from knitty. It is a casual cardigan with beautiful drape to it. The process has been interesting, it is constructed sideways, starting with the end of one sleeve and working to the middle from there, so the work in progress looks nothing like a sweater of any kind. It is also knit out of fingering weight yarn, but on size eight needles, which is what gives the sweater it's drape. This yarn/needle combination produces a fabric that grows much bigger upon blocking, so not only does the sweater not look anything like an article of clothing, it also looks like it will be way too small. This does not create the most inspiring knitting conditions. I've finished the first half, and will cast on for the second as soon as I finish the Invisibility Wrap (or at least that's what I'm telling myself).

Sunday, April 17, 2011

Project Talk: General Updates

Farmer's Market Cardigan
Every winter, I overestimate the amount of knitting that I will be able to accomplish. For some reason, I think I'll be able to whip through large projects and create a mountain of finished goods. Sadly, that is never the case. I'm human, I get distracted, I decided to watch t.v. or read a book, I have to rip out and reknit entire sections of my work, I have less time than I think I will. You know, life happens.


Still trying to get a
decent picture.
Since the beginning of January, I completed a sweater and a pair of socks. The Farmer's Market Cardigan took forever to complete, especially the shawl collar, but was totally worth it. I love, love, love the finished product (though I've been struggling to get a decent picture of it). It is warm and super comfortable.

See, nothing is really
wrong with them.
The socks also felt like they took forever to complete. By the end of the process, I hated the pattern, hated the yarn, and even hated the knitting needles. I have since found other needles, but that is entirely another story. Even though they are finished, I still haven't warmed to them. I still haven't bothered to take them off of the blockers or even try them on. There isn't anything wrong with them, I'm just rather apathetic toward the entire project.

Cat's Paw Lace Socks
Currently on the needles is another pair of socks. These are Cat's Paw Lace socks, knitted in Poems Sock by Wisdom Yarns. The yarn is a cheaper version of Noro's Silk Garden Sock Yarn, and is pretty roughly spun. But the colors and beautiful and the pattern is easy. The socks are done from the toe up, with a short row heel. It just has a simple, single lace repeat on a stockinette background. It goes fast and I'm already past the heel of the first sock, so I will carry on.

Coming Soon!
Super Secret Project
My current non-sock project is a gift, so it is under a media blackout. But it is going well, and I'm pretty happy with the results so far. Pictures and project details will be posted later.

On deck, are a number of projects. I'd like to get another sweater done before abandoning heavy woolen knitting for the summer. I'm torn between making another Wicked Sweater, this time in a nicer yarn or finally taking on the February Lady Sweater. I'm leaning toward the February Lady Sweater, because I have been wanting to knit that one for a long time, but it always seems to get pushed back as other projects shove their way to the front of the queue.

As far as summer knitting goes, I need to make some washcloths for around the house, but I also have a number of summer weight projects I want to work on. And we cannot forget those unexpected last minute projects that always seem to crop up.